Home

Main Menu


Access Terawatt






Lost Password?
Register

Syndicate

RSS 0.91
RSS 1.0
RSS 2.0
ATOM 0.3
OPML
Commercial Case 2

 

 

   
Regular annual Purchased Energy Use
Costs($) average US 11$ per MMBtu

Electricity and Natural Gas 98,800

1,086,800

(3412 BTUs = 1 kWh) 28,823,529 kWh

 
Regular purchased Energy Use (5 years period)  

Electricity and Natural Gas 494,000

5,434,000

Comparison with DSS System 
 

System

Price($)

1 TERAWATT 3.5 MW

5,000,000

+ annual maintenance costs (5% of purchase price)
This DSS System would have a payback period of only 5 years (due to eliminated electricity and natural gas costs).
No fuel costs for the entire lifetime operation
Additional maintenance costs
   

 



Oak Ridge National Laboratory East Campus

Commercial Office
Moderator Group: Research DSS LA

376,000 sq. feet (34,900 sq. meters)
Project scope: 4 3-story buildings
Typically occupied by 760 people, 40 hours per person per week; and 300 visitors per week, 8 hours per visitor per week
average consumption: 3,290 kW

Indoor Spaces:
Office (55%), Laboratory (30%), Data processing (10%), Conference (4%), Public assembly (2%), Restrooms (2%), Mechanical systems (2%), Electrical systems (1%)

Outdoor Spaces:
Garden—decorative, Pedestrian/non-motorized vehicle path, Patio/hardscape, Shade structures/outdoor rooms
Commercial Case 1 (3.5 Mega Watt)
Commercial Case 2 (3.2 Mega Watt)
Commercial Case 3 (182 kW)
Commercial Case 4 (47 kW)
Industrial Case 1 (69 kW)
Industrial Case 2 (45 kW)
Residential Case 1 (1.4 Mega Watt)
Residential Case 2 (144 kW)
Residential Case 3 (2 kW)